- Purchased and installed Microwave
- Capped old refrigerator water line (to prevent possible leak)
- Added junction box in crawl space for hanging live wire found by Mr. Sparky
- Added conduit to breaker box for new range electric supply line.
- Ran new 8-3 wire for stove from breaker box to new location
- Mounted new surface mounted outlet for range
- Fixed water leak from cracked drain line
- Assembled Lazy-Susan cabinet
- Removed more old tile.
- Finalized plans for counter layout
- Sanded and stained base cabinets (except silverware)
This one passes
|
What a mess...
|
Tile removal
|
New range outlet ready to go
|
Base cabinets stained.
Water leak fixed
TODO This week:
- Finish staining and polyurethane base cabinets
- Order Lazy-Susan hardware
- Install drawer slides in base cabinets
- Finish box joint jig and build a drawer
- Get gas line/stove moved
- Start tearing out half wall in nook.