Monday, March 24, 2014

Week 3/17-3/23 Progress

We were able to get a good amount of work done this weekend. Here is a list of the different things we worked on:
  • Fixed drywall in ceiling/wall corner where wall cabinets mount 
  • Primed and pained wall behind wall cabinets 
  • Removed old wall cabinets and installed in garage
  • Mounted all the wall cabinets 
  • Moved the outlet that would have ended up over the oven down the wall. 
  • Added an outlet in the microwave cabinet 
  • Wired up under cabinet LED power supply to 120v. 
  • Tested and mounted soft touch PWM Led brightness controller 
  • Built LED strips and mounted lights under 3/4 of cabinets
Old cabinets gone!
New cabinets go up!
Microwave wiring changes
Work foreman taking a break

Most of the wall cabinets mounted and microwave outlet installed

Testing PWM LED controller mounted under cabinet

Some of the under cabinet lighting working

TODO This week:
  • Order microwave and replacement Alder plywood sheet
  • Finish mounting LED lighting
  • Build small base cabinets (does not include sink/lazy susan)
  • Start staining base cabinets
  • Mock up space lost in Nook if we add cabinets to back of current cabinets
  • Install microwave
  • Add outlet to provide power for counter top to the right of the stove.
  • Finish/Test box joint jig.


2 comments:

  1. #1 on the TODO list has been done. I ordered the microwave today, and it should be here Thursday. I also ordered the replacement Alder plywood sheet.

    ReplyDelete
  2. Thank you! Now put together those cabinets...

    ReplyDelete