- Fixed drywall in ceiling/wall corner where wall cabinets mount
- Primed and pained wall behind wall cabinets
- Removed old wall cabinets and installed in garage
- Mounted all the wall cabinets
- Moved the outlet that would have ended up over the oven down the wall.
- Added an outlet in the microwave cabinet
- Wired up under cabinet LED power supply to 120v.
- Tested and mounted soft touch PWM Led brightness controller
- Built LED strips and mounted lights under 3/4 of cabinets
Old cabinets gone!
|
New cabinets go up!
|
Microwave wiring changes
|
Work foreman taking a break
|
Most of the wall cabinets mounted and microwave outlet installed
Testing PWM LED controller mounted under cabinet
Some of the under cabinet lighting working
TODO This week:
- Order microwave and replacement Alder plywood sheet
- Finish mounting LED lighting
- Build small base cabinets (does not include sink/lazy susan)
- Start staining base cabinets
- Mock up space lost in Nook if we add cabinets to back of current cabinets
- Install microwave
- Add outlet to provide power for counter top to the right of the stove.
- Finish/Test box joint jig.
#1 on the TODO list has been done. I ordered the microwave today, and it should be here Thursday. I also ordered the replacement Alder plywood sheet.