Monday, March 17, 2014

Weekend 3/15-3/16 Progress

We were able to get a good bit of work done this weekend.   All of the wall cabinet cases are stained and polyurethaned as well as the tall pantry and over the fridge cabinets.  I also got the drywall repaired where we added the fridge water line and the ceiling corners in the fridge area that were pretty messed up from the popcorn ceiling removal.  Sally also picked our our new kitchen paint and I painted the area where the pantry/fridge cabinets are going.  We are going with Brookline Beige from
I had help from Logan testing that the cabinets were put together correctly before installation.  They all passed his vigorous stress testing... Late Sunday night I was able to get the tall pantry/fridge cabinets mounted in place.





Next TODOs:
1) repair drywall ceiling corners where wall cabinets are going
2) Paint above/behind wall cabinet areas
3) Move outlet up so it is behind microwave
4) Mount all wall cabinets

1 comment: